Rehabilitation & Upgrade of Swale Drain, Wodonga

Principal: department of transport & planning
Value: $1.5 million
Location: wondonga
Delivery: 2026
Sector: Roads & Transport Infrastructure

Project Overview

Whelans Group has successfully completed the rehabilitation and upgrade of the swale drain in Wodonga, delivering improved stormwater management and long-term site stability within the growing industrial precinct adjacent to the Hume Freeway.

The final stages of the project included drainage construction, topsoil reinstatement and site rehabilitation works to restore the area and establish vegetation cover. With all works now complete, the project has been officially handed over to the Department of Transport and Planning (DTP).

Key Works Delivered

  • Vegetation removal and site establishment

  • Temporary access track construction

  • Swale drain realignment and earthworks

  • Drainage infrastructure construction

  • Erosion and sediment control measures

  • Topsoil reinstatement

  • Site rehabilitation and revegetation

Project Outcome

Delivered safely and on schedule, the completed works provide improved stormwater conveyance, enhanced site stability and long-term drainage performance. The successful rehabilitation of the corridor supports ongoing development within the precinct while minimising future maintenance requirements.

 