Princes Highway Overtaking Lanes – Bellbird Creek & Thurra River

Delivery Period: 2018 – 2019

Project Overview

Whelans Group delivered the construction of overtaking lanes at Bellbird Creek and Thurra River along the Princes Highway, improving safety and traffic flow across a key regional transport route in East Gippsland.

The works involved coordinated delivery across two separate sites within a live highway environment, requiring controlled staging and integration of earthworks, pavement and drainage activities.

Scope of Works

  • Bulk earthworks and site establishment

  • Overtaking lane construction and road widening

  • Pavement construction and sealing

  • Drainage installation and water management integration

  • Traffic staging and control within an operational highway corridor

  • Installation of line marking, signage and roadside safety treatments

Delivery Highlights

  • Concurrent delivery of two overtaking lane packages within a live corridor

  • Integrated earthworks, pavement and drainage construction

  • Staged works maintaining traffic flow and road user safety

  • Efficient delivery across regional and geographically separated sites

Challenges

  • Maintaining safe traffic conditions within an operational highway

  • Coordinating works across multiple project locations

  • Managing construction sequencing within a constrained corridor

  • Delivering consistent outcomes across concurrent packages

Outcome

The overtaking lanes improved road safety and travel efficiency along the Princes Highway, providing increased opportunities for safe overtaking and reducing congestion along this critical regional route.

The project demonstrated Whelans capability to deliver coordinated, multi-site infrastructure works within live transport environments across regional Victoria.

 